Temporary Fabric Aircraft Hanger Lease
Department of Defense — Department of the Air Force
Description
Mountain Home Air Force Base (MHAFB) is currently in the planning phase for a short-term operational requirement. The Contracting Office is conducting market research to identify capable sources and obtain Rough Order of Magnitude (ROM) cost estimates for the lease, installation, and removal of temporary aircraft hangar systems. — The government requires temporary hangar structures capable of housing and protecting roughly two (2) F-15 aircrafts and an additional temporary hanger roughly 50 ft by 50 ft . Key parameters include: — Duration: A two (2) month operational period. — Services Required: Full turnkey support, to include delivery, on-site installation/assembly, and complete disassembly/removal upon lease expiration. — Estimated Timeline: Performance is anticipated to begin on or about September 2027 . — Estimated Cost (ROM): A rough, non-binding cost estimate broken down by: — Mobilization, delivery, and installation. — Monthly lease/rental rate (for the 2-month duration). — Disassembly, removal, and demobilization. — Please confirm your capability to deliver, install, and remove structures matching these dimensions and timeline constraints.
Mountain Home Air Force Base (MHAFB) is currently in the planning phase for a short-term operational requirement. The Contracting Office is conducting market research to identify capable sources and obtain Rough Order of Magnitude (ROM) cost estimates for the lease, installation, and removal of temporary aircraft hangar systems. — The government requires temporary hangar structures capable of housing and protecting roughly two (2) F-15 aircrafts and an additional temporary hanger roughly 50 ft by 50 ft . Key parameters include: — Duration: A two (2) month operational period. — Services Required: Full turnkey support, to include delivery, on-site installation/assembly, and complete disassembly/removal upon lease expiration. — Estimated Timeline: Performance is anticipated to begin on or about September 2027 . — Estimated Cost (ROM): A rough, non-binding cost estimate broken down by: — Mobilization, delivery, and installation. — Monthly lease/rental rate (for the 2-month duration). — Disassembly, removal, and demobilization. — Please confirm your capability to deliver, install, and remove structures matching these dimensions and timeline constraints.
Create a free account to read the full description
Sign up to access complete RFP details, match scores, and more.
Create Free AccountInterested in this opportunity?
Create a free account to view the full description, get match scores, and save this RFP to your pipeline.
View Full Details See pricing plansSource
SAM.gov