Back to browse
OH Combined Synopsis/Solicitation Total Small Business

Material Handling and Storage Aid Systems at JB Lindsey Graham, SC

Department of Defense — Department of the Air Force

Solicitation Number FA860427QB002
Posted Date Nov 25, 2026
Due Date Jan 7, 2027
Estimated Value Not specified
NAICS Codes 333922
Place of Performance Not specified

Description

This requirement is for a mechanized materials handling system (MMHS)/storage aid system for Buildings 506 and 543, at Joint Base Lindsey Graham, South Carolina. The project encompasses the design, fabrication, installation, orientation, and testing of a storage aid system within the buildings. All work shall be performed in accordance the Cover Purchase Description (PD) document, including Appendices A-H, and Air Force (AF) Drawings BCH602-01, BCH602-02, BCH602-03 and BCH602-04. The contractor shall provide all equipment, materials, and labor necessary for the complete installation and testing of the MMHS. This includes making any required system adjustments and providing orientation to Government personnel. The contractor shall comply with all applicable laws, regulations, local zoning and permitting requirements, and referenced governmental guidance documents as specified in the PD document and appendices. The Mechanized Materials Handling System will consist of the following major components: Gantry Crane System, Manual Gravity Roller Conveyor, Expandable Roller Conveyor, Mobile Aisle - 1, Mobile Aisle - 2, Mobile Aisle - 3, Bin Shelving, Pallet Racks Type P1 through P7, Steel Decking, all types and Rolling Safety Ladders.

This requirement is for a mechanized materials handling system (MMHS)/storage aid system for Buildings 506 and 543, at Joint Base Lindsey Graham, South Carolina. The project encompasses the design, fabrication, installation, orientation, and testing of a storage aid system within the buildings. All work shall be performed in accordance the Cover Purchase Description (PD) document, including Appendices A-H, and Air Force (AF) Drawings BCH602-01, BCH602-02, BCH602-03 and BCH602-04. The contractor shall provide all equipment, materials, and labor necessary for the complete installation and testing of the MMHS. This includes making any required system adjustments and providing orientation to Government personnel. The contractor shall comply with all applicable laws, regulations, local zoning and permitting requirements, and referenced governmental guidance documents as specified in the PD document and appendices. The Mechanized Materials Handling System will consist of the following major components: Gantry Crane System, Manual Gravity Roller Conveyor, Expandable Roller Conveyor, Mobile Aisle - 1, Mobile Aisle - 2, Mobile Aisle - 3, Bin Shelving, Pallet Racks Type P1 through P7, Steel Decking, all types and Rolling Safety Ladders.

Create a free account to read the full description

Sign up to access complete RFP details, match scores, and more.

Create Free Account